Product Monitoring产品监视与测量程序(中英文).docx

上传人:lao****ou 文档编号:129827 上传时间:2023-04-05 格式:DOCX 页数:5 大小:9KB
下载 相关 举报
Product Monitoring产品监视与测量程序(中英文).docx_第1页
第1页 / 共5页
Product Monitoring产品监视与测量程序(中英文).docx_第2页
第2页 / 共5页
Product Monitoring产品监视与测量程序(中英文).docx_第3页
第3页 / 共5页
Product Monitoring产品监视与测量程序(中英文).docx_第4页
第4页 / 共5页
Product Monitoring产品监视与测量程序(中英文).docx_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《Product Monitoring产品监视与测量程序(中英文).docx》由会员分享,可在线阅读,更多相关《Product Monitoring产品监视与测量程序(中英文).docx(5页珍藏版)》请在第一文库网上搜索。

1、6.1 Quality department take charge of incoming, process and shipment checking.质量部负责来料检验、过程检验和出货检验。7.0 PROCESS 流程7.1 Incoming inspection 来料检验7.1.1 Out-Sourcing parts implemented incoming inspection after PSW approval, before PSWapproval, Any sample inspection must be fill in test request form FN-QA-0

2、23 to quality.And also need provide drawing which dimension need inspection together with the form.Measuring Engineer arrange dimension inspection according the Test request andfeedback the result to requestor外购零件在PPAP批准后执行进料检验,按照以下流程操作;PPAP批准前的样件如需检测,需求者填写测试申请单给质量部门,同时需要定义需要检测的尺寸。测量工程师按照测试申请的要求安排测量

3、。测试完成后将测量结果反馈给申请人!7.1.2 QA/PM defines incoming inspection items according the Special characteristic andcomponents PFMEA, all components cavity must be included in incoming sampling, and 1pcs at least for each cavity.质量、项目参照产品的特殊特性和供应商的PFMEA来定义来料检验项目。进料抽样需包含所有模穴,每个模穴至少1件7.1.3 When receive material,

4、WH delivers the good receiving slip to QI.仓库接收来料后,将收货单给质量检验员。7.1.4 For un-exemption materials, QI inspectors sample based on SIP and inspect partsfollowing QI inspection Wl, and make record in FN-QA-001 .The record could be 5 pcs at most.检验的材料,质量检验员按SIP标准抽检零件,按来料检验规范或作业指导书进行检验,记录FN-QA-001进料检验记录表,最多记

5、录5个数据。A) If parts are accepted, inspector paste green label on the materials and inform WH tomove to stock.如果合格,质量检验员贴上绿色合格标签,并通知仓库入库。B) If they find the non-conforming parts and inform supplier quality engineer to confirm.QI release FN-QA-004 and paste non-conforming labels, then inform planning en

6、gineer and moves the materials to thenonconforming area.7.0 PROCESS 流程7.1 Incoming inspection 来料检验7.1.1 Out-Sourcing parts implemented incoming inspection after PSW approval, before PSWapproval, Any sample inspection must be fill in test request form FN-QA-023 to quality.And also need provide drawin

7、g which dimension need inspection together with the form.Measuring Engineer arrange dimension inspection according the Test request andfeedback the result to requestor外购零件在PPAP批准后执行进料检验,按照以下流程操作;PPAP批准前的样件如需检测,需求者填写测试申请单给质量部门,同时需要定义需要检测的尺寸。测量工程师按照测试申请的要求安排测量。测试完成后将测量结果反馈给申请人!7.1.2 QA/PM defines inco

8、ming inspection items according the Special characteristic andcomponents PFMEA, all components cavity must be included in incoming sampling, and 1pcs at least for each cavity.质量、项目参照产品的特殊特性和供应商的PFMEA来定义来料检验项目。进料抽样需包含所有模穴,每个模穴至少1件7.1.3 When receive material, WH delivers the good receiving slip to QI.

9、仓库接收来料后,将收货单给质量检验员。7.1.4 For un-exemption materials, QI inspectors sample based on SIP and inspect partsfollowing QI inspection Wl, and make record in FN-QA-001 .The record could be 5 pcs at most.检验的材料,质量检验员按SIP标准抽检零件,按来料检验规范或作业指导书进行检验,记录FN-QA-001进料检验记录表,最多记录5个数据。A) If parts are accepted, inspector

10、paste green label on the materials and inform WH tomove to stock.如果合格,质量检验员贴上绿色合格标签,并通知仓库入库。B) If they find the non-conforming parts and inform supplier quality engineer to confirm.QI release FN-QA-004 and paste non-conforming labels, then inform planning engineer and moves the materials to thenonco

11、nforming area.7.0 PROCESS 流程7.1 Incoming inspection 来料检验7.1.1 Out-Sourcing parts implemented incoming inspection after PSW approval, before PSWapproval, Any sample inspection must be fill in test request form FN-QA-023 to quality.And also need provide drawing which dimension need inspection together

12、 with the form.Measuring Engineer arrange dimension inspection according the Test request andfeedback the result to requestor外购零件在PPAP批准后执行进料检验,按照以下流程操作;PPAP批准前的样件如需检测,需求者填写测试申请单给质量部门,同时需要定义需要检测的尺寸。测量工程师按照测试申请的要求安排测量。测试完成后将测量结果反馈给申请人!7.1.2 QA/PM defines incoming inspection items according the Specia

13、l characteristic andcomponents PFMEA, all components cavity must be included in incoming sampling, and 1pcs at least for each cavity.质量、项目参照产品的特殊特性和供应商的PFMEA来定义来料检验项目。进料抽样需包含所有模穴,每个模穴至少1件7.1.3 When receive material, WH delivers the good receiving slip to QI.仓库接收来料后,将收货单给质量检验员。7.1.4 For un-exemption

14、materials, QI inspectors sample based on SIP and inspect partsfollowing QI inspection Wl, and make record in FN-QA-001 .The record could be 5 pcs at most.检验的材料,质量检验员按SIP标准抽检零件,按来料检验规范或作业指导书进行检验,记录FN-QA-001进料检验记录表,最多记录5个数据。A) If parts are accepted, inspector paste green label on the materials and inf

15、orm WH tomove to stock.如果合格,质量检验员贴上绿色合格标签,并通知仓库入库。B) If they find the non-conforming parts and inform supplier quality engineer to confirm.QI release FN-QA-004 and paste non-conforming labels, then inform planning engineer and moves the materials to thenonconforming area.7.0 PROCESS 流程7.1 Incoming inspection 来料检验7.1.1 Out-Sourcing parts implemented incoming inspection after PSW approval, before PSWapp

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 应用文档 > 汇报材料

copyright@ 2008-2022 001doc.com网站版权所有   

经营许可证编号:宁ICP备2022001085号

本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有,必要时第一文库网拥有上传用户文档的转载和下载权。第一文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知第一文库网,我们立即给予删除!



客服